COT 269◊ Surveying

Explore the use of surveying equipment such as tape, level, transit and theodolite to establish bench marks, give line and grade, layout building sites, run cross sections, do slope staking, run simple transverse, stake a curve and perform a staditransit survey.  

Credit Hours: 3.0
Lecture Hours: 1.0
Lab Hours: 4.0
Course Fee Required
Prerequisites