IBC 205 Carpentry: Finished Carpentry

Installation of finish materials in residential construction. Sheathing, siding, insulation, stairs, flooring, drywall installation and finishing, as well as miter cuts and installation of crown molding, base molding, casing, wainscot paneling, door installation, window installation and roofing. Wall finishing, including paint finishes, wall paper and paneling also will be covered.

Credit Hours: 3.0
Lecture Hours: 1.0
Lab Hours: 4.0
Course Fee Required
Prerequisites


Course offerings

Sections of IBC205 at Term: Spring 2013 (136)

 
Course
Status
Title
Start Time
Instructor
End Time
Start Date
Days
End Date
Room
Books
Info
IBC205001FNISHD CRPENTRYSIKORA, LU01/24/1305/16/13 
12 Open Seats 07:30 PM09:50 PMTuTh R 226DBook Info
 
1 CLASSES SCHEDULED