Triton College
Architecture and Interior Design Department
Studio Task List
Post articles on Kiosk
- Weekly (Articles will be placed in your mail box)
Change word of the Day
- Daily (Folder is in lab assistant's mail box)
Place latest issue of magazines
on table by front door - Weekly - Will be placed in lab assistant's box
Go around studio and collect
drafting and model building supplies and put in cabinet - Daily
Post drawings in hallway
windows - Weekly (Drawings to be posted will be propped up next to Heitzman's
desk)
Clean up trash found in
studio - Daily
Reshelve technical books
on shelves under window - arrange according to CSI format (see CSI list below)
- Weekly
Reshelve Sweets Catalogs
- Weekly
Reshelve materials in cases
- arrange according to CSI format (see CSI list below) - Daily
Pick up and take mail to
mail room - Daily
Fix parallel bars - Weekly
Throw away old damaged
models - Weekly
Check and restock paper
in all printers - Daily Clean
junk off top of material cabinets - Weekly
Replace empty ink jet cartridges
- As needed - check daily (Get replacements from IT services accross the hall)
Send promotion letters
to high schools - Monthly (Letters will be prepared by teachers)
Clean up and maintain archives
- As needed
Start and maintain a lost
and found box
Make copies for teachers
- Daily (Originals will be placed in your mailbox)
CSI organization format
(all construction materials and books need to be shelved according to this system)
1 General (Not Used)
2 Existing Construction (Not Used)
3 Concrete and steel reinforcement bars
4 Masonry - brick, stone, concrete block, terracotta
5 Metals - steel beams, channels, angles, tees, joists, plates
6 Wood
7 Roofing and insulation
8 Doors, windows and hardware (door knobs and hinges)
9 Interior finishes - floor tile, wood floors, paint, wallcovering, ceramic tile, plastic laminate, cork, stone used for interior finishes
10 Specialties - toilet accessories
11 Equipment - appliances
12 Furniture and carpet
13 Special construction - greenhouses, prefabricated buildings, bleachers, truck bumpers
14 Elevators and escalators
21 Fire protection
22 Plumbing
23 Heating, ventilating and air conditioning
26 Electrical and lighting
32 Site Work - such as
fencing or landscape materials